8/02/2011

Visit to Maharashtra's largest dam



Gosikhurd project, a 10,000 crore INR project is one of the largest projects in Vidarbha region. It includes main dam at Gosikhurd village, left and right bank Canal, 4 Lift Irrigation Scheme (LIS) on reservoir, 2 LIS on left bank canal, renovation of Asolamendha project etc.  It is lcated approx. 100 Km from Nagpur. This project is expected to irrigate nearly 5,00,000 hactares of land by 2012. currently, it is irrigating 2,56,000 hectares of land in Vidarbha. Gosikhurd village is located in Pauni Tahsil of
Bhandara district on Wainganga River. Wainganga originates near the village Pratapgarh in
Madhya Pradesh and traverses almost North-South through
Bhandara and Chandrapur district of Maharashtra state. We visited Gosikhurd dam which is created by constructing a composite dam 11.35 km long across River Wainganga. i.e. earthen
Dam both the right and left ban flanks of central masonry gated Ogee spillway 773m long in the river gorge and 14 m above foundation level.
The total catchment area drained up to the proposed dam site of Gosikhurd project is 34,860
km2, out of which 24,261 km2 lies in Madhya Pradesh and 10,627 km2 in Maharashtra
State. Gosikhurd reservoir is created by constructing a composite dam 11.35 km long with earth embankment across River Wainganga. The radial gates of 18.3x16.5 m are used first time in Maharashtra to discharge a design flood of 67,300 m3/sec. The gates are the second largest in India and largest in Maharashtra.
The submerged village.

         According to the engineer, we met there, more than 200 villages with population more than 25000 were displaced due to the project. The affected people want the same  The villagers were given land plots along the state highway with basic arrangements.  Still the problem is not sorted out. The people are not happy for what they have been provided. They want  the same provision as provided to the people affected by MIHAN(Multi-modal International Cargo Hub and Airport at Nagpur).
Gate opening system to operate the second largest gate in India.





Right Bank Canal

   

It is biggest challenge to every engineer of the circle, to convert all designs and drawings in to reality, without entertaining any mistake or fault. Definitely, their contribution in the success of the entire project is uncountable.

7/31/2011

Broadlink doubles the speed for unlimited users

 There's a good news for the internet users in Nepal, especially those in urban Nepal where Broadlink has its presence. Broadlink, the leading ISP in Nepal has increased its speed by two times. Now the users will get the speed of 256 Kbps with the same price they used to pay for 128 Kbps unlimited plan. It has completely removed its all packages of 128 Kbps with 256 Kbps. Now the Broadlink customers will be able to surf unlimited for 1 month at Rs. 899 including taxes at 256 Kbps.  It now becomes the only ISP in Nepal with the cheapest wireless broadband service.
In addition, the speed for another volume based package, 3GB for Rs. 499 has been increased to 5 Mbps from 768 Kbps.  With this move, the company is expected to attract the users of NTC ADSL service and NCell Connect. Currently, the ADSL users are paying Rs.900 per month excluding 24% tax.  Yeah…ADSl is providing half the speed and is 24% more expensive than Broadlink. Ncell Connect users pay Rs. 499 for 500 MB usage at 3.1 Mbps.

7/16/2011

Budget Rey!!!









Listening budget is really exciting. yo hola, tyo hola bhadai!!! This is what I'm doing for many years. Listening budget allocation for some really big mega projects from our finance minister in each budget speech is as interesting as being sad after analyzing that even after half a decade, the foundation is not laid. The projects like Ktm-Terai fast track, Budhi Gandaki HEP, East West Electric Railway Project, Tamakoshi HEP, etc. can really bring some big economic improvements in the country. What I feel worse is the stability of the government and its reluctance in executing the developmental projects. There are some silver lining in the timely completion of Upper Tamakoshi HEP mainly because of the participation of multiple private financial institution. The government undertaken projects are very unlikely to complete in time or they are being delayed and completed at two or three times the estimated cost.

Stil 'A Hope' remains
I'm about to lose my patience. But everything is not bad at all. We may not have 8% growth of GDP, still its more than +3%. Maintaining above 3% economic growth at this fragile condition is not bad at all. Development of Roadways and communication is still impressive. Its just the matter of time. We have no other options left than to be optimistic that Nepal finally gets a new constitution which gurantees the prosperity and stability of Nepal.